|
Sep 21st, 06, 05:33 PM
I agree with you Dan. I charge seperate for the decking (includes skirting and post) and the railing. I also seperate the cost for stripping vs sealing. Steps are an extra charge and 2nd story decks have a surcharge between $40 and $80. Sealer is figured seperately depending on what the customer wants. Everybody seems to figure their estimates differently. When contractors post on this thread that they charge so much per sq ft, is that the flooring sq ft just added to the sq ft of the railing (height times length) and does that include the sealer?
|