Quote:
Originally Posted by Tom DeFrancesco
Larry,
Prep, strip, brighten, dry and stain all in 4 hours ???????
|
Absolutely, I don't charge for the time it takes to dry, but then again, I don't sit there and watch it dry either. Do you?
Prep, strip, brighten (with x-jet), 1 1/2 hours.
Stain with Deckscapes oil-based 2 1/2 hours.
Total=4 hours.